CASL_GAP (Castle Gap Solar) (16INR0065)

CASL_GAP (Castle Gap Solar) is a 180.0 MW solar interconnection project with a current status of operational. It is proposed to connect at 132781 Castle Gap 34.5kV.

180.0 MWCapacity
OperationalStatus
ERCOTMarket
SolarTechnology

Project facts

Canonical nameCASL_GAP (Castle Gap Solar)
Queue ID16INR0065
Statusoperational
Source statusoperational
MarketERCOT
TechnologySolar
Capacity180.0 MW
State
County
Point of interconnection132781 Castle Gap 34.5kV
Requested (queue) date2014-09-19
Proposed in-service date2018-06-01
Operational date2018-05-31
Withdrawn date
DeveloperVistra Corp
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata