CASTLE WIND OFFSHORE is a 559.3 MW wind interconnection project in San Luis Obispo, California with a current status of withdrawn. It is proposed to connect at Morro Bay Substation 230kV.

559.3 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameCASTLE WIND OFFSHORE
Queue ID1494
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity559.3 MW
StateCalifornia
CountySan Luis Obispo
Point of interconnectionMorro Bay Substation 230kV
Requested (queue) date2018-04-16
Proposed in-service date
Operational date
Withdrawn date2019-04-08
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.