CATHODE BESS (24INR0394)

CATHODE BESS is a 150.0 MW other interconnection project in Upton, Texas with a current status of operational. It is proposed to connect at 76635 King Mountain 138kV .

150.0 MWCapacity
OperationalStatus
UptonMarket
OtherTechnology

Project facts

Canonical nameCATHODE BESS
Queue ID24INR0394
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketUpton
TechnologyOther
Capacity150.0 MW
StateTexas
CountyUpton
Point of interconnection76635 King Mountain 138kV
Requested (queue) date2022-08-05
Proposed in-service date
Operational date2027-12-31
Withdrawn date
DeveloperCED Development Inc
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.