Cato 138/69kV (facilities above 100kV) (J3327)
Cato 138/69kV (facilities above 100kV) is a 130.0 MW battery interconnection project in Pike, Indiana with a current status of withdrawn. It is proposed to connect at Cato 138/69kV (facilities above 100kV).
130.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Cato 138/69kV (facilities above 100kV) |
|---|---|
| Queue ID | J3327 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 130.0 MW |
| State | Indiana |
| County | Pike |
| Point of interconnection | Cato 138/69kV (facilities above 100kV) |
| Requested (queue) date | 2024-04-16 |
| Proposed in-service date | 2027-05-01 |
| Operational date | 2027-05-01 |
| Withdrawn date | 2025-09-30 |
| Developer | — |
| Utility / transmission owner | Southern Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata