Cato 138/69kV (facilities above 100kV) (S1112)

Cato 138/69kV (facilities above 100kV) is a 130.0 MW battery interconnection project in Pike, Indiana with a current status of operational. It is proposed to connect at Cato 138/69kV (facilities above 100kV).

130.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameCato 138/69kV (facilities above 100kV)
Queue IDS1112
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity130.0 MW
StateIndiana
CountyPike
Point of interconnectionCato 138/69kV (facilities above 100kV)
Requested (queue) date2025-08-11
Proposed in-service date2027-09-30
Operational date2027-09-30
Withdrawn date
Developer
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata