Cato 138 kV Substation is a 32.5 MW battery interconnection project in Pike County, Indiana with a current status of withdrawn. It is proposed to connect at Cato 138 kV Substation.

32.5 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameCato 138 kV Substation
Queue IDJ1233
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity32.5 MW
StateIndiana
CountyPike County
Point of interconnectionCato 138 kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date2023-02-06
Developer—
Utility / transmission ownerSouthern Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.