Cayuga 230 kV (J2132)

Cayuga 230 kV is a 300.0 MW wind interconnection project in Vermillion, Indiana with a current status of withdrawn. It is proposed to connect at Cayuga 230 kV.

300.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameCayuga 230 kV
Queue IDJ2132
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.0 MW
StateIndiana
CountyVermillion
Point of interconnectionCayuga 230 kV
Requested (queue) date2022-10-31
Proposed in-service date2024-04-15
Operational date2024-04-15
Withdrawn date2024-08-16
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata