CAYUGA 345 (J3678)
CAYUGA 345 is a 300.0 MW battery interconnection project in Vermillion, Indiana with a current status of withdrawn. It is proposed to connect at CAYUGA 345.
300.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | CAYUGA 345 |
|---|---|
| Queue ID | J3678 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 300.0 MW |
| State | Indiana |
| County | Vermillion |
| Point of interconnection | CAYUGA 345 |
| Requested (queue) date | 2024-04-18 |
| Proposed in-service date | 2027-09-10 |
| Operational date | 2027-09-10 |
| Withdrawn date | 2025-12-23 |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.