Cayuga Grid, LLC (0951)

Cayuga Grid, LLC is a 100.0 MW battery interconnection project in Erie, New York with a current status of withdrawn. It is proposed to connect at New Gardenville 115kV Substation.

100.0 MWCapacity
WithdrawnStatus
AMarket
BatteryTechnology

Project facts

Canonical nameCayuga Grid, LLC
Queue ID0951
Statuswithdrawn
Source status0
MarketA
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyErie
Point of interconnectionNew Gardenville 115kV Substation
Requested (queue) date2019-12-04
Proposed in-service date2023-04-30
Operational date
Withdrawn date
DeveloperCayuga Grid, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.