Cayuga - Nucor 345kV is a 303.6 MW wind interconnection project in Montgomery County, Indiana with a current status of withdrawn. It is proposed to connect at Cayuga - Nucor 345kV.

303.6 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameCayuga - Nucor 345kV
Queue IDJ754
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity303.6 MW
StateIndiana
CountyMontgomery County
Point of interconnectionCayuga - Nucor 345kV
Requested (queue) date2016-11-14
Proposed in-service date2019-03-08
Operational date2019-03-08
Withdrawn date2020-09-30
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.