Cayuta Add-on (1540)

Cayuta Add-on is a 2.0 MW battery interconnection project in Schuyler, New York with a current status of withdrawn. It is proposed to connect at The POI will be located 1.78mi from Cayuta 34.5kV substation and 11.78mi from Ridge Road 230kV substation. Utilizes the same gen-tie line to deliver power to the POI at existing 34.5 kV pole located at 42.272362°, -76.731007°.

2.0 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameCayuta Add-on
Queue ID1540
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity2.0 MW
StateNew York
CountySchuyler
Point of interconnectionThe POI will be located 1.78mi from Cayuta 34.5kV substation and 11.78mi from Ridge Road 230kV substation. Utilizes the same gen-tie line to deliver power to the POI at existing 34.5 kV pole located at 42.272362°, -76.731007°
Requested (queue) date2023-03-20
Proposed in-service date2023-05-31
Operational date
Withdrawn date
DeveloperNexamp Solar
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata