Cayuta Add-on (1540)
Cayuta Add-on is a 2.0 MW battery interconnection project in Schuyler, New York with a current status of withdrawn. It is proposed to connect at The POI will be located 1.78mi from Cayuta 34.5kV substation and 11.78mi from Ridge Road 230kV substation. Utilizes the same gen-tie line to deliver power to the POI at existing 34.5 kV pole located at 42.272362°, -76.731007°.
Project facts
| Canonical name | Cayuta Add-on |
|---|---|
| Queue ID | 1540 |
| Status | withdrawn |
| Source status | 0 |
| Market | C |
| Technology | Battery |
| Capacity | 2.0 MW |
| State | New York |
| County | Schuyler |
| Point of interconnection | The POI will be located 1.78mi from Cayuta 34.5kV substation and 11.78mi from Ridge Road 230kV substation. Utilizes the same gen-tie line to deliver power to the POI at existing 34.5 kV pole located at 42.272362°, -76.731007° |
| Requested (queue) date | 2023-03-20 |
| Proposed in-service date | 2023-05-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Nexamp Solar |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.