Cazadores Solar is a 301.6 MW solar interconnection project in Duval, Texas with a current status of operational. It is proposed to connect at (80079) CRUCE7A – (5901) MIGUEL5.

301.6 MWCapacity
OperationalStatus
DuvalMarket
SolarTechnology

Project facts

Canonical nameCazadores Solar
Queue ID29INR0160
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDuval
TechnologySolar
Capacity301.6 MW
StateTexas
CountyDuval
Point of interconnection(80079) CRUCE7A – (5901) MIGUEL5
Requested (queue) date2025-07-07
Proposed in-service date
Operational date2029-04-10
Withdrawn date
DeveloperOCI Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.