Cazadores Solar (29INR0160)

Cazadores Solar is a 301.6 MW solar interconnection project in Duval, Texas with a current status of operational. It is proposed to connect at Tap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2.

301.6 MWCapacity
OperationalStatus
DuvalMarket
SolarTechnology

Project facts

Canonical nameCazadores Solar
Queue ID29INR0160
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDuval
TechnologySolar
Capacity301.6 MW
StateTexas
CountyDuval
Point of interconnectionTap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2
Requested (queue) date2025-07-07
Proposed in-service date—
Operational date2029-04-10
Withdrawn date—
DeveloperOCI Energy LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30poi_name(80079) CRUCE7A – (5901) MIGUEL5Tap 345 kV (80079) CRUCE7A – (5901) MIGUEL5 CKT 2low
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.