CDG Owego 2, LLC (1082)

CDG Owego 2, LLC is a 19.6 MW solar interconnection project in Tioga, New York with a current status of withdrawn. It is proposed to connect at Line 513 - 34.5KV.

19.6 MWCapacity
WithdrawnStatus
CMarket
SolarTechnology

Project facts

Canonical nameCDG Owego 2, LLC
Queue ID1082
Statuswithdrawn
Source status0
MarketC
TechnologySolar
Capacity19.6 MW
StateNew York
CountyTioga
Point of interconnectionLine 513 - 34.5KV
Requested (queue) date2020-08-27
Proposed in-service date2021-02-28
Operational date
Withdrawn date
DeveloperCDG Owego 2
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata