Celeste Energy Storage (21INR0503)

Celeste Energy Storage is a 60.9 MW battery interconnection project in Pecos, Texas with a current status of suspended.

60.9 MWCapacity
SuspendedStatus
PecosMarket
BatteryTechnology

Project facts

Canonical nameCeleste Energy Storage
Queue ID21INR0503
Statussuspended
Source status
MarketPecos
TechnologyBattery
Capacity60.9 MW
StateTexas
CountyPecos
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectsuspendedhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.