Celestine Storage (1347)

Celestine Storage is a 191.1 MW battery interconnection project in Steuben, New York with a current status of withdrawn. It is proposed to connect at Bath 115 kV substation.

191.1 MWCapacity
WithdrawnStatus
CMarket
BatteryTechnology

Project facts

Canonical nameCelestine Storage
Queue ID1347
Statuswithdrawn
Source status0
MarketC
TechnologyBattery
Capacity191.1 MW
StateNew York
CountySteuben
Point of interconnectionBath 115 kV substation
Requested (queue) date2022-03-11
Proposed in-service date2022-06-30
Operational date
Withdrawn date
DeveloperHanwha Q CELLS USA
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.