Cenizo Solar (29INR0219)
Cenizo Solar is a 301.4 MW solar interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at Tap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2.
301.4 MWCapacity
OperationalStatus
WebbMarket
SolarTechnology
Project facts
| Canonical name | Cenizo Solar |
|---|---|
| Queue ID | 29INR0219 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Webb |
| Technology | Solar |
| Capacity | 301.4 MW |
| State | Texas |
| County | Webb |
| Point of interconnection | Tap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2 |
| Requested (queue) date | 2025-11-24 |
| Proposed in-service date | — |
| Operational date | 2029-12-31 |
| Withdrawn date | — |
| Developer | Cenizo Energy Center LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | phase | SS Completed, FIS Started, No IA | SS Completed, FIS Started, IA | low |
| 2026-10-30 | ia_signed_date | — | 2026-09-28 | medium |
| 2026-09-30 | developer | Renew Development Holdco, LLC | Cenizo Energy Center LLC | low |
| 2026-09-30 | poi_name | Tap 345 kV 80220 Cenizo - 80079 Cruce | Tap 345 kV 80220 Cenizo - 80079 Cruce Ckt 2 | low |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.