Center - Tenaha 138 kV Line (GEN-2024-123)

Center - Tenaha 138 kV Line is a 120.0 MW solar interconnection project in Shelby, Texas with a current status of withdrawn. It is proposed to connect at Center - Tenaha 138 kV Line.

120.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameCenter - Tenaha 138 kV Line
Queue IDGEN-2024-123
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity120.0 MW
StateTexas
CountyShelby
Point of interconnectionCenter - Tenaha 138 kV Line
Requested (queue) date2025-03-01
Proposed in-service date2030-12-31
Operational date
Withdrawn date2026-05-21
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata