Centerburg 138 kV (AH1-036)

Centerburg 138 kV is a 100.0 MW battery interconnection project in Licking, Ohio with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCenterburg 138 kV
Queue IDAH1-036
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateOhio
CountyLicking
Point of interconnection
Requested (queue) date2021-06-15
Proposed in-service date2024-07-01
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.