Centerburg 138kV (AD2-067)

Centerburg 138kV is a 150.0 MW solar interconnection project in Licking, Ohio with a current status of active.

150.0 MWCapacity
ActiveStatus
—Market
SolarTechnology

Project facts

Canonical nameCenterburg 138kV
Queue IDAD2-067
Statusactive
Source statusEngineering and Procurement
Market—
TechnologySolar
Capacity150.0 MW
StateOhio
CountyLicking
Point of interconnection—
Requested (queue) date2018-03-02
Proposed in-service date2028-01-15
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata