CENTINELA SOLAR ENERGY EXPANSION (45 MW) (643AM)

CENTINELA SOLAR ENERGY EXPANSION (45 MW) is a 45.0 MW solar interconnection project in Imperial, California with a current status of operational. It is proposed to connect at Imperial Valley Substation 230 kV.

45.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCENTINELA SOLAR ENERGY EXPANSION (45 MW)
Queue ID643AM
Statusoperational
Source statusCOMPLETED
Market
TechnologySolar
Capacity45.0 MW
StateCalifornia
CountyImperial
Point of interconnectionImperial Valley Substation 230 kV
Requested (queue) date2010-07-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata