CENTINELA SOLAR ENERGY FACILITY 2MWFT (1090)

CENTINELA SOLAR ENERGY FACILITY 2MWFT is a 2.0 MW battery interconnection project in Imperial, California with a current status of withdrawn. It is proposed to connect at Imperial Valley 230kV sub.

2.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCENTINELA SOLAR ENERGY FACILITY 2MWFT
Queue ID1090
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity2.0 MW
StateCalifornia
CountyImperial
Point of interconnectionImperial Valley 230kV sub
Requested (queue) date2014-06-11
Proposed in-service date
Operational date
Withdrawn date2014-09-04
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata