Central Duke Energy Florida, LLC20 is a 269.0 MW gas interconnection project in Osceola, Florida with a current status of active. It is proposed to connect at City 230 kV Substation.

269.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology

Project facts

Canonical nameCentral Duke Energy Florida, LLC20
Queue IDFC100382
Statusactive
Source status12/31/2030 e – in g eu ws t Mer S et tu ind gy R Pe ep no drt
MarketFL
TechnologyGas
Capacity269.0 MW
StateFlorida
CountyOsceola
Point of interconnectionCity 230 kV Substation
Requested (queue) date2025-12-12
Proposed in-service date
Operational date
Withdrawn date
DeveloperCentral Duke Energy Florida, LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata