Central Duke Energy Florida, LLC20 (FC100386)
Central Duke Energy Florida, LLC20 is a 269.0 MW gas interconnection project in Osceola, Florida with a current status of active. It is proposed to connect at City 230 kV Substation.
269.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology
Project facts
| Canonical name | Central Duke Energy Florida, LLC20 |
|---|---|
| Queue ID | FC100386 |
| Status | active |
| Source status | 12/31/2030 e – in g eu ws t Mer S et tu ind gy R Pe ep no drt |
| Market | FL |
| Technology | Gas |
| Capacity | 269.0 MW |
| State | Florida |
| County | Osceola |
| Point of interconnection | City 230 kV Substation |
| Requested (queue) date | 2025-12-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Central Duke Energy Florida, LLC20 |
| Utility / transmission owner | Duke Energy Progress |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata