Central Masked LLC20 (FC100379)

Central Masked LLC20 is a 12.0 MW gas interconnection project in Orange, Florida with a current status of active. It is proposed to connect at Parkway 69 kV Substation.

12.0 MWCapacity
ActiveStatus
FLMarket
GasTechnology

Project facts

Canonical nameCentral Masked LLC20
Queue IDFC100379
Statusactive
Source statuse – in g et ee mrc eo nn n –e Pc eti no dn
MarketFL
TechnologyGas
Capacity12.0 MW
StateFlorida
CountyOrange
Point of interconnectionParkway 69 kV Substation
Requested (queue) date2025-11-25
Proposed in-service date2026-06-01
Operational date
Withdrawn date
DeveloperCentral Masked LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.