Cerulean Phase 2 – CCGT (29INR0248)

Cerulean Phase 2 – CCGT is a 1,264.6 MW gas interconnection project in Victoria, Texas with a current status of operational. It is proposed to connect at Tap <345kV> <#80286> <DULCE7A> - <#8676> <STATIC7A>.

1,264.6 MWCapacity
OperationalStatus
VictoriaMarket
GasTechnology

Project facts

Canonical nameCerulean Phase 2 – CCGT
Queue ID29INR0248
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketVictoria
TechnologyGas
Capacity1,264.6 MW
StateTexas
CountyVictoria
Point of interconnectionTap <345kV> <#80286> <DULCE7A> - <#8676> <STATIC7A>
Requested (queue) date2026-01-26
Proposed in-service date
Operational date2031-10-17
Withdrawn date
DeveloperBrother 1, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata