CH Solterra LLC is a 143.0 MW solar interconnection project in Hopkins, Texas with a current status of operational. It is proposed to connect at Tap 138kV 11796 White Oak POI - 11797 Brinker POI.

143.0 MWCapacity
OperationalStatus
HopkinsMarket
SolarTechnology

Project facts

Canonical nameCH Solterra LLC
Queue ID23INR0229
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHopkins
TechnologySolar
Capacity143.0 MW
StateTexas
CountyHopkins
Point of interconnectionTap 138kV 11796 White Oak POI - 11797 Brinker POI
Requested (queue) date2021-03-19
Proposed in-service date
Operational date2027-05-31
Withdrawn date
DeveloperCH Solterra LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.