Chacon Creek (27INR0206)

Chacon Creek is a 188.9 MW other interconnection project in Medina, Texas with a current status of operational. It is proposed to connect at (#8962) LYTLE4A 138KV.

188.9 MWCapacity
OperationalStatus
MedinaMarket
OtherTechnology

Project facts

Canonical nameChacon Creek
Queue ID27INR0206
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMedina
TechnologyOther
Capacity188.9 MW
StateTexas
CountyMedina
Point of interconnection(#8962) LYTLE4A 138KV
Requested (queue) date2024-03-22
Proposed in-service date
Operational date2027-10-31
Withdrawn date
DeveloperCattlemen BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata