Chanarambie 115 kV Substation (J1498)

Chanarambie 115 kV Substation is a 50.0 MW battery interconnection project in Murray, Minnesota with a current status of withdrawn. It is proposed to connect at Chanarambie 115 kV Substation.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameChanarambie 115 kV Substation
Queue IDJ1498
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateMinnesota
CountyMurray
Point of interconnectionChanarambie 115 kV Substation
Requested (queue) date2020-06-09
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2023-01-31
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata