Chapman-Moshannon 230kV (H15)

Chapman-Moshannon 230kV is a 520.0 MW gas interconnection project in Clearfield, Pennsylvania with a current status of withdrawn.

520.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameChapman-Moshannon 230kV
Queue IDH15
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity520.0 MW
StatePennsylvania
CountyClearfield
Point of interconnection
Requested (queue) date2001-12-20
Proposed in-service date2006-12-01
Operational date
Withdrawn date2002-11-04
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata