Chappelle Creek - Leland Olds 345kV (GEN-2017-114)

Chappelle Creek - Leland Olds 345kV is a 450.0 MW wind interconnection project in Dewey, South Dakota with a current status of withdrawn. It is proposed to connect at Chappelle Creek - Leland Olds 345kV.

450.0 MWCapacity
WithdrawnStatus
SDMarket
WindTechnology

Project facts

Canonical nameChappelle Creek - Leland Olds 345kV
Queue IDGEN-2017-114
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologyWind
Capacity450.0 MW
StateSouth Dakota
CountyDewey
Point of interconnectionChappelle Creek - Leland Olds 345kV
Requested (queue) date2017-10-23
Proposed in-service date
Operational date
Withdrawn date2022-09-21
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata