Charlie Creek Solar Power Plant (63982_PV1)

Charlie Creek Solar Power Plant is a 74.9 MW solar interconnection project in Hardee, Florida with a current status of operational.

74.9 MWCapacity
OperationalStatus
FPCMarket
SolarTechnology

Project facts

Canonical nameCharlie Creek Solar Power Plant
Queue ID63982_PV1
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyHardee
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2022-08-01
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata