Cheat Lake-Ruthbelle 138 kV (AH1-340 - moved to TC2)

Cheat Lake-Ruthbelle 138 kV is a 48.9 MW solar interconnection project in Preston, West Virginia with a current status of withdrawn.

48.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCheat Lake-Ruthbelle 138 kV
Queue IDAH1-340 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity48.9 MW
StateWest Virginia
CountyPreston
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2027-12-31
Operational date
Withdrawn date2025-11-13
Developer
Utility / transmission ownerAPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.