Chenoweth Substation (L0388)
Chenoweth Substation is a 40.0 MW other interconnection project in Wasco, Oregon with a current status of operational. It is proposed to connect at BPA's Chenoweth Substation.
40.0 MWCapacity
OperationalStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Chenoweth Substation |
|---|---|
| Queue ID | L0388 |
| Status | operational |
| Source status | ENERGIZED |
| Market | OR |
| Technology | Other |
| Capacity | 40.0 MW |
| State | Oregon |
| County | Wasco |
| Point of interconnection | BPA's Chenoweth Substation |
| Requested (queue) date | 2015-09-08 |
| Proposed in-service date | — |
| Operational date | 2017-10-01 |
| Withdrawn date | — |
| Developer | Northern Wasco County People's Utility District |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata