Cherry Blossom Solar (GI-142)

Cherry Blossom Solar is a 150.0 MW solar+battery interconnection project in Twiggs County, Georgia with a current status of active. It is proposed to connect at Danville 115 kV Substation.

150.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCherry Blossom Solar
Queue IDGI-142
Statusactive
Source statusFSA Issued
MarketGA
TechnologySolar+Battery
Capacity150.0 MW
StateGeorgia
CountyTwiggs County
Point of interconnectionDanville 115 kV Substation
Requested (queue) date2020-08-13
Proposed in-service date2023-04-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.