Cherry Ridge 66kV (AH1-592 - moved to TC2)

Cherry Ridge 66kV is a 45.0 MW battery interconnection project in Grant, West Virginia with a current status of withdrawn.

45.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCherry Ridge 66kV
Queue IDAH1-592 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity45.0 MW
StateWest Virginia
CountyGrant
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2024-12-16
Operational date
Withdrawn date2025-07-08
Developer
Utility / transmission ownerAPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata