Cherry Tree Solar (GI-159)

Cherry Tree Solar is a 150.0 MW solar+battery interconnection project in Washington County, Georgia with a current status of active. It is proposed to connect at Sandersville-Wadley 230 kV.

150.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCherry Tree Solar
Queue IDGI-159
Statusactive
Source statusFacilities Study
MarketGA
TechnologySolar+Battery
Capacity150.0 MW
StateGeorgia
CountyWashington County
Point of interconnectionSandersville-Wadley 230 kV
Requested (queue) date2021-12-16
Proposed in-service date2025-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.