Chestnut Hill 702 Substation - NG Western MA Area Cluster Study (810)

Chestnut Hill 702 Substation - NG Western MA Area Cluster Study is a 3.3 MW solar interconnection project in Worcester, Massachusetts with a current status of operational. It is proposed to connect at NG Chestnut Hill 702 Substation.

3.3 MWCapacity
OperationalStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameChestnut Hill 702 Substation - NG Western MA Area Cluster Study
Queue ID810
Statusoperational
Source statusC
MarketWMA
TechnologySolar
Capacity3.3 MW
StateMassachusetts
CountyWorcester
Point of interconnectionNG Chestnut Hill 702 Substation
Requested (queue) date2018-12-14
Proposed in-service date
Operational date2020-03-05
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata