Chihuahuan Desert Solar (67174_10TXC)

Chihuahuan Desert Solar is a 10.0 MW solar interconnection project in El Paso, Texas with a current status of operational.

10.0 MWCapacity
OperationalStatus
EPEMarket
SolarTechnology

Project facts

Canonical nameChihuahuan Desert Solar
Queue ID67174_10TXC
Statusoperational
Source status(OP) Operating
MarketEPE
TechnologySolar
Capacity10.0 MW
StateTexas
CountyEl Paso
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-05-01
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata