Chinook Energy Storage Center (C24-153)

Chinook Energy Storage Center is a 500.0 MW battery interconnection project in Lewis, New York with a current status of withdrawn. It is proposed to connect at Adirondack - Austin Road Line #13, 345kV line..

500.0 MWCapacity
WithdrawnStatus
NYISOMarket
BatteryTechnology

Project facts

Canonical nameChinook Energy Storage Center
Queue IDC24-153
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyBattery
Capacity500.0 MW
StateNew York
CountyLewis
Point of interconnectionAdirondack - Austin Road Line #13, 345kV line.
Requested (queue) date2024-09-11
Proposed in-service date
Operational date
Withdrawn date
DeveloperHydrostor USA Holdings, Inc , a subsidiary of Hydrostor Inc
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.