Chocolate Bayou BESS (24INR0583)

Chocolate Bayou BESS is a 9.9 MW battery interconnection project with a current status of active. It is proposed to connect at Station Name: CHOCBAYU _x000D_ Load Name: 38_12_1. Node number 0701._x000D_ Bus #: 80064_x000D_ Voltage: 138 kV.

9.9 MWCapacity
ActiveStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameChocolate Bayou BESS
Queue ID24INR0583
Statusactive
Source statusactive
MarketERCOT
TechnologyBattery
Capacity9.9 MW
State
County
Point of interconnectionStation Name: CHOCBAYU _x000D_ Load Name: 38_12_1. Node number 0701._x000D_ Bus #: 80064_x000D_ Voltage: 138 kV
Requested (queue) date2023-08-22
Proposed in-service date2026-05-01
Operational date
Withdrawn date
DeveloperConcurrent Holdco. , LLC.
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.