Cicero 3-SLCHI603 (68129_CH603)

Cicero 3-SLCHI603 is a 1.9 MW solar interconnection project in Cook, Illinois with a current status of active.

1.9 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameCicero 3-SLCHI603
Queue ID68129_CH603
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketPJM
TechnologySolar
Capacity1.9 MW
StateIllinois
CountyCook
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPrologis Logistics Services Incorporated

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-02proposed_online_date2027-04-012027-07-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.