Cimarron Antelope 230 kV Sub (GEN-2014-029)

Cimarron Antelope 230 kV Sub is a 108.8 MW solar interconnection project in Hale, Texas with a current status of withdrawn. It is proposed to connect at Cimarron Antelope 230 kV Sub.

108.8 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameCimarron Antelope 230 kV Sub
Queue IDGEN-2014-029
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity108.8 MW
StateTexas
CountyHale
Point of interconnectionCimarron Antelope 230 kV Sub
Requested (queue) date2014-09-25
Proposed in-service date
Operational date
Withdrawn date2014-10-02
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.