Cincinnati 138 kV Substation (J2579)

Cincinnati 138 kV Substation is a 362.0 MW solar interconnection project in Tazewell, Illinois with a current status of withdrawn. It is proposed to connect at Cincinnati 138 kV Substation.

362.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCincinnati 138 kV Substation
Queue IDJ2579
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity362.0 MW
StateIllinois
CountyTazewell
Point of interconnectionCincinnati 138 kV Substation
Requested (queue) date2022-09-15
Proposed in-service date2027-06-15
Operational date2027-06-15
Withdrawn date2023-03-10
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.