Circleville 138kV (AC2-029)

Circleville 138kV is a 70.0 MW solar interconnection project in Pickaway, Ohio with a current status of suspended.

70.0 MWCapacity
SuspendedStatus
Market
SolarTechnology

Project facts

Canonical nameCircleville 138kV
Queue IDAC2-029
Statussuspended
Source statusSuspended
Market
TechnologySolar
Capacity70.0 MW
StateOhio
CountyPickaway
Point of interconnection
Requested (queue) date2017-02-02
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectsuspendedhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata