Citrus City BESS is a 9.9 MW battery interconnection project in Hidalgo, Texas with a current status of operational.

9.9 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameCitrus City BESS
Queue ID68686_MCC01
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity9.9 MW
StateTexas
CountyHidalgo
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-07-01
Withdrawn date
Developer
Utility / transmission ownerPrologis Logistics Services Incorporated

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata