Citrus Ridge Solar (61988_FL501)

Citrus Ridge Solar is a 52.0 MW solar interconnection project in Orange, Florida with a current status of operational.

52.0 MWCapacity
OperationalStatus
FPCMarket
SolarTechnology

Project facts

Canonical nameCitrus Ridge Solar
Queue ID61988_FL501
Statusoperational
Source status(OP) Operating
MarketFPC
TechnologySolar
Capacity52.0 MW
StateFlorida
CountyOrange
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-12-01
Withdrawn date—
Developer—
Utility / transmission ownerFL Solar 5, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.