Clarence Cannon (6140_2)

Clarence Cannon is a 31.0 MW battery interconnection project in Ralls, Missouri with a current status of operational.

31.0 MWCapacity
OperationalStatus
AECIMarket
BatteryTechnology

Project facts

Canonical nameClarence Cannon
Queue ID6140_2
Statusoperational
Source status(OP) Operating
MarketAECI
TechnologyBattery
Capacity31.0 MW
StateMissouri
CountyRalls
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1984-11-01
Withdrawn date
Developer
Utility / transmission ownerUSCE-St Louis District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata