Ralls County, Missouri — Interconnection Projects

The interXdata warehouse tracks 7 interconnection projects in Ralls, Missouri, representing 993 MW of requested capacity.

7Total projects
1Active
3Operational
3Withdrawn
993 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2500 MW
Solar3435 MW
Battery131 MW
Other127 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Sibley - Overton 345kV Line BreakGEN-2018-041Wind400.0 MWwithdrawnRalls, Missouri
5SPALDNG (AECI) - 5PENOCRK 161.0kVJ3720Solar200.0 MWwithdrawnRalls, Missouri
SPENCER CREEKJ2288Solar175.0 MWoperationalRalls, Missouri
Sibley - Overton 345kV Line BreakGEN-2018-040Wind100.0 MWwithdrawnRalls, Missouri
Blue Jay Road Solar, LLC68926_BLUEJSolar60.0 MWactiveRalls, Missouri
Clarence Cannon6140_2Battery31.0 MWoperationalRalls, Missouri
Clarence Cannon6140_1Other27.0 MWoperationalRalls, Missouri

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); MISO — generator interconnection queue; Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Ralls County.