Clark Public Utilities (G46-01)

Clark Public Utilities is a 250.0 MW gas interconnection project in Clark, Washington with a current status of withdrawn. It is proposed to connect at 115 kV bus at BPA Alcoa Substation.

250.0 MWCapacity
WithdrawnStatus
WAMarket
GasTechnology

Project facts

Canonical nameClark Public Utilities
Queue IDG46-01
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyGas
Capacity250.0 MW
StateWashington
CountyClark
Point of interconnection115 kV bus at BPA Alcoa Substation
Requested (queue) date2001-04-17
Proposed in-service date2002-07-01
Operational date
Withdrawn date
DeveloperClark Public Utilities
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.