Claytor is a 18.7 MW other interconnection project in Pulaski, Virginia with a current status of operational.

18.7 MWCapacity
OperationalStatus
PJMMarket
OtherTechnology

Project facts

Canonical nameClaytor
Queue ID3774_4
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologyOther
Capacity18.7 MW
StateVirginia
CountyPulaski
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1939-08-01
Withdrawn date
Developer
Utility / transmission ownerAppalachian Power Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata